PEMASANGAN GASSEOUS SUPRESSION SYSTEM PLTU BELITUNGPT PLN NUSANTARA POWER SERVICES
(FEBRUARI 2025)
PROYEK WATER RECOVERY DAN IMPROVEMENT OF BOILER SUPPORT EQUIPMENTPT TRI SAKTI PURWOSARI MAKMUR, PASURUAN
(JANUARI – MARET 2025)
PEMASANGAN FIRE SUPPRESSION LOKAL KUBIKEL INCOMING 20 KV GI 150 KV KOSAMBI BARUPT PLN (PERSERO) UPT KARAWANG
(DESEMBER 2024)
PENGADAAN JASA PENGGANTIAN, SERTIFIKASI TANGKI TIMBUN DRY CHEMICAL POWDER, TERA DAN ISI ULANG TABUNGN2 DAN CO2PT PLN NUSANTARA POWER UP GRESIK
PENGADAAN DAN INSTALASI KABEL DAN PANEL UNTUK AREA BOILERPT TRI SAKTI PURWOSARI MAKMUR, PASURUAN
(AGUSTUS – SEPTEMBER 2024)
PENGADAAN PANEL SDP BOILER
PT TRI SAKTI PURWOSARI MAKMUR
(AGUSTUS 2024)
PEMBANGUNAN RUMAH BOILER D AN PROYEK SISTEM REVERSE OSMOSIS
(MEI 2024)
FIRE SUPPRESSION LOKAL KUBIKEL INCOMING 20 KV – GI UJUNG BERUNG
PT PLN (PERSERO) UPT BANDUNG
(SEPTEMBER 2023)
INSTALASI FIRE ALARM
PT PLN INDONESIA POWER UPDK TELLO
(JULI 2023)
UPGRADE KAPASITAS POMPA HYDRANT GIS BANDARA NGURAH RAI
PT PLN (PERSERO) UPT BALI
(JUNI 2023)
FIRE PROTECTION INCOMING 20 KV – GI KRAPYAK & GI BATANG
(DESEMBER 2022)
JASA INTEGRASI PERGUDANGAN DAN SISTEM BARCODE
PT PJB UNIT BISNIS JASA O & M PLTMG ARUN
(NOVEMBER 2022)
PEMASANGAN/PENORMALAN DEGAS TANK CHLORINATION PLTGU
PT PJB UNIT PEMBANGKITAN GRESIK
(OKTOBER 2022)
PEMASANGAN MODUL FIRE ALARM PLTU 3-4
(JUNI 2022)
PEMASANGAN HYDRANT PUMP SYSTEM
PT KALTIM MEDIKA UTAMA SETIARA – BALIKPAPAN
(MEI 2022)
PERBAIKAN TROUBLE ALARM FIRE ALARM DAN FIRE EXT SIEMENS
(MARET 2022)
PEMASANGAN FIRE PROTECTION GUDANG ATS – CNG PLANT
(OKTOBER 2021)
PEMASANGAN GAS DETECTOR CNG PLANT
(AGUSTUS 2021)
PEMASANGAN FIRE ALARM TPS LIMBAH B3
(APRIL 2021)
PEKERJAAN PENAMBAHAN FASILITAS FIRE TRAINING SERVICE CENTER TAHAP 2
PT PJB UBJ O&M PLTU PAITON
(DESEMBER 2019)
PEMASANGAN LINE SUCTION CWHE PLTU #4
(AGUSTUS 2018)
PEMASANGAN VALVE HYDROGEN
PT PJB UNIT PEMBANGKITAN PAITON
(JANUARI 2018)
PENGGANTIAN LINE INJECTION & LINE BY PASS
(SEPTEMBER 2017)
PENGGANTIAN LINE SUPPLY SEA WATER
(APRIL 2017)
PEMASANGAN SAFEMATE TANGGA CWP A & B PLTGU
(JANUARI 2016)
PENGGANTIAN LINE GAS RECEIVING
(AGUSTUS 2015)
PENGGANTIAN PIPA GAS PV-200 PLTU #4
(JULI 2015)
PEMASANGAN REDESIGN SHOWER
PT PJB UBJOM PLTU TANJUNG AWAR-AWAR
(APRIL 2015)
PENGGANTIAN PIPA GAS FV-200 PLTU #4
(NOVEMBER 2014)
ASSEMBLING PANEL
PT PISMA CIKAL
(SEPTEMBER 2014)
PEKERJAAN PRESSURE REDUCING SYSTEM
PT PGN GAGAS
(JULI 2014)
SPARING PIPA INSTALASI LISTRIK
PENGGANTIAN LINE MAIN STEAM
(SEPTEMBER 2013)