Project Reference


PEMASANGAN GASSEOUS SUPRESSION SYSTEM PLTU BELITUNG
PT PLN NUSANTARA POWER SERVICES

(FEBRUARI 2025)


PROYEK WATER RECOVERY DAN IMPROVEMENT OF BOILER SUPPORT EQUIPMENT
PT TRI SAKTI PURWOSARI MAKMUR, PASURUAN

(JANUARI – MARET 2025)

PEMASANGAN FIRE SUPPRESSION LOKAL KUBIKEL INCOMING 20 KV GI 150 KV KOSAMBI BARU
PT PLN (PERSERO) UPT KARAWANG

(DESEMBER 2024)

PENGADAAN JASA PENGGANTIAN, SERTIFIKASI TANGKI TIMBUN DRY CHEMICAL POWDER, TERA DAN ISI ULANG TABUNG
N2 DAN CO2
PT PLN NUSANTARA POWER UP GRESIK

(DESEMBER 2024)

PENGADAAN DAN INSTALASI KABEL DAN PANEL UNTUK AREA BOILER
PT TRI SAKTI PURWOSARI MAKMUR, PASURUAN

(AGUSTUS – SEPTEMBER 2024)

PENGADAAN PANEL SDP BOILER

PT TRI SAKTI PURWOSARI MAKMUR

(AGUSTUS 2024)

PEMBANGUNAN RUMAH BOILER D AN PROYEK SISTEM REVERSE OSMOSIS

PT TRI SAKTI PURWOSARI MAKMUR

(MEI 2024)

FIRE SUPPRESSION LOKAL KUBIKEL INCOMING 20 KV – GI UJUNG BERUNG

PT PLN (PERSERO) UPT BANDUNG

(SEPTEMBER 2023)

INSTALASI FIRE ALARM

PT PLN INDONESIA POWER UPDK TELLO

(JULI 2023)

UPGRADE KAPASITAS POMPA HYDRANT GIS BANDARA NGURAH RAI

PT PLN (PERSERO) UPT BALI

(JUNI 2023)

FIRE PROTECTION INCOMING 20 KV – GI KRAPYAK & GI BATANG

PT PLN (PERSERO) UPT BANDUNG

(DESEMBER 2022)

JASA INTEGRASI PERGUDANGAN DAN SISTEM BARCODE

PT PJB UNIT BISNIS JASA O & M PLTMG ARUN

(NOVEMBER 2022)

PEMASANGAN/PENORMALAN DEGAS TANK CHLORINATION PLTGU

PT PJB UNIT PEMBANGKITAN GRESIK 

(OKTOBER 2022)

PEMASANGAN MODUL FIRE ALARM PLTU 3-4

PT PJB UNIT PEMBANGKITAN GRESIK 

(JUNI 2022)

PEMASANGAN HYDRANT PUMP SYSTEM

PT KALTIM MEDIKA UTAMA SETIARA – BALIKPAPAN

(MEI 2022)

PERBAIKAN TROUBLE ALARM FIRE ALARM DAN FIRE EXT SIEMENS

PT PJB UNIT PEMBANGKITAN GRESIK 

(MARET 2022)

PEMASANGAN FIRE PROTECTION GUDANG ATS – CNG PLANT

PT PJB UNIT PEMBANGKITAN GRESIK 

(OKTOBER 2021)

PEMASANGAN GAS DETECTOR CNG PLANT

PT PJB UNIT PEMBANGKITAN GRESIK 

(AGUSTUS 2021)

PEMASANGAN FIRE ALARM TPS LIMBAH B3

PT PJB UNIT PEMBANGKITAN GRESIK 

(APRIL 2021)

 PEKERJAAN PENAMBAHAN FASILITAS FIRE TRAINING SERVICE CENTER TAHAP 2

PT PJB UBJ O&M PLTU PAITON

(DESEMBER 2019)

PEMASANGAN LINE SUCTION CWHE PLTU #4

PT PJB UNIT PEMBANGKITAN GRESIK 

(AGUSTUS 2018)

PEMASANGAN VALVE HYDROGEN

PT PJB UNIT PEMBANGKITAN PAITON 

(JANUARI 2018)

PENGGANTIAN LINE INJECTION & LINE BY PASS

PT PJB UNIT PEMBANGKITAN GRESIK

(SEPTEMBER 2017)

PENGGANTIAN LINE SUPPLY SEA WATER

PT PJB UNIT PEMBANGKITAN GRESIK 

(APRIL 2017)

PEMASANGAN SAFEMATE TANGGA CWP A & B PLTGU

PT PJB UNIT PEMBANGKITAN GRESIK 

(JANUARI 2016)

PENGGANTIAN LINE GAS RECEIVING

PT PJB UNIT PEMBANGKITAN GRESIK 

(AGUSTUS 2015)

PENGGANTIAN PIPA GAS PV-200 PLTU #4

PT PJB UNIT PEMBANGKITAN GRESIK 

(JULI 2015)

PEMASANGAN REDESIGN SHOWER

PT PJB UBJOM PLTU TANJUNG AWAR-AWAR 

(APRIL 2015)

PENGGANTIAN PIPA GAS FV-200 PLTU #4

PT PJB UNIT PEMBANGKITAN GRESIK 

(NOVEMBER 2014)

ASSEMBLING PANEL

PT PISMA CIKAL

(SEPTEMBER 2014)

PEKERJAAN PRESSURE REDUCING SYSTEM

PT PGN GAGAS 

(JULI 2014)

 SPARING PIPA INSTALASI LISTRIK

PT PISMA CIKAL

(JULI 2014)

PENGGANTIAN LINE MAIN STEAM

PT PJB UNIT PEMBANGKITAN GRESIK

(SEPTEMBER 2013)